Volt Fleet
Fleet operations with cost-optimized smart charging.
18.5h
18:30
simulated time
Live fleet map
Eight vehicles running routes across the city. Click a vehicle for its live status — green halo means it is charging at the depot.
Atlas
ChargingV1 · depot van · 22 kW plug
Battery82%
- Capacity
- 93 kWh
- Target at departure
- 95%
- Est. range now
- 225 mi
- Energy scheduled today
- 72.5 kWh
- Charging cost today
- $8.70
- Departs at
- 06:30
Smart charging schedule
Greedy cheapest-slot-first optimization against the time-of-use price curve. Move the depot power-cap slider and watch the savings change — every figure is computed live by scheduleCharging().
120kW
Optimized cost
$65.61
total energy cost / day
Naive baseline cost
$175.41
charge at arrival, no optimization
Savings
$109.80▲ 62.6%
per day vs baseline
Savings
62.6%
of baseline cost
Scheduled power per 15-minute slot (kW)
off-peak $0.12 mid $0.24 peak $0.48
00:00
04:00
08:00
12:00
16:00
20:00
Time-of-use price curve ($/kWh)
Price
Trip planner
Energy feasibility for a trip, computed live by planTrip() using the vehicle's current simulated charge.
120mi
65mph
1200ft
Verdict
Feasible- Trip energy
- 43.4 kWh
- Arrival battery
- 36%
Trip is feasible. Expect to arrive with ~36% battery remaining.